| Herkunftsort: | USA |
| Markenname: | GE |
| Zertifizierung: | CO |
| Modellnummer: | IS200SPROH1ABC |
| Min Bestellmenge: | 1pc |
|---|---|
| Preis: | $3000 |
| Verpackung Informationen: | 6.4" x 6.4" x 4.8" (16cm x 16cm x 12cm) |
| Lieferzeit: | 5-8 Arbeitstage |
| Zahlungsbedingungen: | T/t |
| Versorgungsmaterial-Fähigkeit: | 10pcs |
| Markenname: | GE | Modell: | IS200SPROH1ABC |
|---|---|---|---|
| Zustand: | Neu | Bruttogewicht/Versandgewicht: | 2,2 lbs / 35,2 oz / 1 kg |
| Packgröße: | 6.4" x 6.4" x 4.8" (16cm x 16cm x 12cm) | Herkunftsland/Ursprungsland: | Vereinigte Staaten (USA) |
| Vorlaufzeit: | Auf Lager | Versandhafen: | Xiamen |
| Zahlung: | T/t | Verkaufspreis: | ANFRAGE |
| Farbe: | Abhängig vom Material | Garantie: | 12 Monate |
| Vorlaufzeit: | 5-8 Arbeitstage | Kurierpartner: | DHL, UPS, TNT, FedEx und EMS |
| Hervorheben: | GE IS200SPROH1ABC terminal board,turbine control circuit card,GE Fanuc PLC terminal board |
||
GE IS200SPROH1ABC Terminal Board For Turbine Control Systems Circuit Card
Product Details:
| Brand Name | GE |
| Model | IS200SPROH1ABC |
| Catalog | Mark VI |
| Origin | United States (USA) |
| Dimension | 16*16*12cm |
| Weight | 1kg |
| HS Code | 8537101190 |
| Payment | T/T |
| Sales Price | $3000 |
| Warranty | 12 months |
| Lead time | 3-5 work days |
Additional Information:
| N/M | N/M |
Description:
The GE IS200SPROH1ABC it is part of Mark VIe control system. The Emergency Protection (SPRO) terminal board is designed to interface with either a PPRO (Primary Protection) or YPRO (Backup Protection) I/O pack. The SPRO terminal board conditions the incoming speed signal inputs for these I/O packs, ensuring that the control system can accurately monitor the turbine's speed.
The product function it to facilitate communication with the backup trip protection system, the SPRO terminal board includes a DC-37 pin connector. This connector is located next to the PPRO or YPRO I/O pack connector and is used to connect a cable leading to a backup trip relay terminal board. This configuration allows for an additional layer of protection, ensuring that if the primary system fails, the backup system can still initiate a trip to protect the turbine.
![]()
Ansprechpartner: Candy Wang
Telefon: +8618059279924